The total value of infrastructure spending in Latin America
will reach US$142.5bn in 2019 and US$175.8bn in 2020, based on the current
pipeline of 1,711 large-scale projects with a combined value of US$829.2bn,
according to GlobalData, a leading data and analytics company.
GlobalData’s latest report: ‘Infrastructure Insight: Latin
America’ reveals that a wide range of infrastructure investment opportunities
are being created for investors throughout the region by a combination of
favorable demographic trends and the implementation of a number of legislative
reforms.
Dariana Tani, Economist at GlobalData, comments: “Brazil,
Chile, Mexico and Peru are set to drive overall investment between 2018 and
2022 with an expected annual average spend of US$36.3bn, US$17bn, US$13bn and
US$12.4bn respectively. Projects will include the US$2.7bn SP-99 Tamoios
Highway Duplication in São Paulo; the US$6.5bn Lima Metro Line 2 in Peru; and
Chile’s US$3bn Alto Maipo Hydroelectric Complex 531MW.
“In Mexico, infrastructure project spending will be fueled
by the US$2.7bn Mexico-Toluca Interurban Train, the US$1.5bn 887MW Noreste
Combined Cycle Power Plant and the US$848m Jala-Compostela-Las Varas-Puerto
Vallarta Highway.”
However, deteriorating external conditions such as global
trade tensions, higher US interest rates and slowing global growth could
negatively impact the outlook. Further increases in US interest rates, for
instance, could pull more capital away from the region, and push up the cost of
borrowing to build infrastructure.
Meanwhile, political uncertainty over next years elections
in the region and a larger-than-expected recession in Argentina, which could
spread to neighboring countries with strong trade exposures, are other
important risks of note.
Tani continues: “In addition, the potential cancellation of
Mexico City’s New International Airport (NAIM) Project totaling US$13bn,
Mexico’s largest infrastructure project, could hold back much-needed
infrastructure investment in the country over the coming years. Following the
results of a recent referendum regarding the future of NAIM, there are now
serious doubts as to whether construction will continue, putting into doubt
billions in investment and undermining investors’ confidence.”
Furthermore, of the total infrastructure construction
pipeline, 56% of projects by value are in the pre-planning and planning stages,
while 44% are in the pre-execution and execution stages. Moreover, the public
sector is expected to directly finance 40% of the total value of projects while
a mix of public and private sources will finance 33% of the total value. The
remaining 28% will be financed by the private sector, the majority of which are
electricity and power projects.